Shintech VCM/CA Expansion Project

After acquiring the project, Westgate’s team worked out in the field for just short of seven months. During that time we provided a wide array of electrical and instrumentation services.

We first installed DCS cabinets, ensuring their input and output modules worked at optimum levels of efficiency. We also installed control panels and tested each panel using thorough diagnostic tools to make sure that their operators would not have any trouble in working with their systems. Additionally, we performed field instrumentation, to improve and maintain system productivity, reliability, safety, optimization and stability.

At Shintech’s facilities we also had our trained team of electricians work on installing lighting, conduits and wires. They also specifically focused on terminations, and were installed in a manner in which they will have little light loss, and protection against dirt and damage during use.

Man Hours: 24,500