For this project, our team’s primary focus was electrical and instrumentation installation. One of our chief responsibilities was to install fiber optics and instrument tubing, along with a series of complicated fiber optic panels.

Our team of electricians also installed electrical wiring, and to protect the wiring we applied conduits, ensuring safety and stability at all times. In addition to wiring, we also added cabletrays to support the insulated electric cables used for power distribution and communication. Finally, we added control cabinets to their facilities and tested each installation with diagnostic tools to prove ultimate productivity.

Man Hours: 13,200